Technology & process

From Napier grass to compressed biogas

Feedstock → pre-treatment → slurry → anaerobic digestion → raw biogas → H₂S removal → CO₂ upgrading → drying → compression → CBG filling. With digestate recovered as organic manure.

Process overview

The integrated CBG process

Explore each stage of the gas pathway and the digestate pathway, as configured in our flagship plant's Detailed Project Report.

Gas pathway Digestate pathway
Stage 1 of 10

Feedstock harvesting & receipt

Napier grass is harvested and brought to the plant, supplemented by other organic feedstock under the multi-feedstock design. The design basis is 115 TPD at 25% total solids.

  • Napier grass harvesting
  • Multi-feedstock flexibility
  • Weighbridge & storage
Digestate pathwaybranches from stage 04 · Digestion
Digestate dischargeDigested material leaves the CSTR as digestate, containing undigested fibre, nutrients and process water.
Solid–liquid separationDigestate is mechanically separated into a solid fraction and a liquid fraction.
Fermented Organic ManureThe solid fraction is recovered as Fermented Organic Manure (FOM) for soil application after conditioning.
Liquid Fermented Organic ManureThe liquid fraction (LFOM) is partly recirculated to slurry preparation and partly available as a liquid organic nutrient.
Process flow diagram

Plant block diagram

How material and gas move through the plant, with design values from the 5 TPD project. Animated lines show the gas, feedstock and digestate streams.

Napier grass to compressed biogas — process block diagramNapier grass is chopped and ground, made into slurry and fed to a 10,000 cubic metre mesophilic CSTR digester. Raw biogas passes through H2S removal, CO2 upgrading, drying, compression with odourisation and cascade filling as CBG. Digestate is separated into FOM and LFOM, with LFOM recirculated to slurry preparation.Raw biogas · 11,900–13,200 Nm³/day · 55–60% CH₄CBG dispatchLFOM recirculationFeedstockNapier grass · 115 TPDChopping & grindingSize reduction · conveyingSlurry preparationMixing · liquid recirculationCSTR DIGESTER1 × 10,000 m³ · mesophilicHRT ≈ 36 daysH₂S removalWater wash · iron oxyhydroxideCO₂ upgradingChilled water or 2-stage membraneGas dryingDesiccant · heatless regenerationCompressionReciprocating · odourisationCBG cascade filling≥ 98% CH₄ · up to 250 barPLC / SCADA · online gas quality monitoringSolid–liquid separationDigestate dewateringLFOMLiquid fraction · recirculatedFOMFermented organic manureRated CBG outputup to 5,000 kg/daydesign · 330 operating days/year
Schematic block diagram based on the DPR process configuration — not a plot layout or P&ID. Values are design figures, subject to final engineering.
Stage by stage

What happens at each stage

Concise technical notes for each step of the gas pathway.

Biogas upgrading unit with adsorption columns and piping
01

Feedstock harvesting & receipt

Napier grass is harvested and brought to the plant, supplemented by other organic feedstock under the multi-feedstock design. The design basis is 115 TPD at 25% total solids.

  • Napier grass harvesting
  • Multi-feedstock flexibility
  • Weighbridge & storage
02

Chopping, grinding & conveying

Grass is chopped and ground to reduce particle size, increasing the surface area available to microorganisms, then conveyed to slurry preparation.

  • Grass chopping
  • Grinding / size reduction
  • Feedstock conveying
03

Slurry preparation

Prepared biomass is mixed with process liquid — including recirculated liquid from digestate separation — to form a pumpable slurry fed to the digester.

  • Mixing with process water
  • LFOM recirculation
  • Controlled feeding
04

Mesophilic anaerobic digestion

A single 10,000 m³ continuously stirred tank reactor (CSTR) digests the slurry under mesophilic conditions with a hydraulic retention time of approximately 36 days.

  • 1 × 10,000 m³ CSTR
  • Mesophilic regime
  • HRT ≈ 36 days
05

Raw biogas collection

Biogas is collected from the digester headspace. Design production is 11,900–13,200 Nm³/day at 55–60% methane, the balance being mainly CO₂ with traces of H₂S and moisture.

  • 11,900–13,200 Nm³/day
  • 55–60% CH₄
  • Gas collection & handling
06

Hydrogen sulphide removal

Water washing / scrubbing and iron oxyhydroxide media remove H₂S, protecting compressors and pipework from corrosion.

  • Water washing / scrubbing
  • Iron oxyhydroxide media
  • Corrosion protection
07

CO₂ removal & methane upgrading

Chilled-water scrubbing or two-stage membrane technology separates CO₂, upgrading the gas to at least 98% methane.

  • Chilled-water scrubbing
  • or two-stage membranes
  • ≥ 98% CH₄ product
08

Gas drying

A desiccant dryer with heatless regeneration removes moisture to the dew point required for high-pressure storage.

  • Desiccant dryer
  • Heatless regeneration
  • Dew-point control
09

High-pressure compression & odourisation

Reciprocating compressors raise the gas to a design pressure of up to 250 bar. The gas is odourised so that any leak can be detected by smell.

  • Reciprocating compressor
  • Up to 250 bar
  • Odourisation
10

CBG cascade filling & dispatch

Compressed biogas is stored and dispatched through cascade filling. PLC/SCADA and online gas analysers monitor quality throughout.

  • Cascade filling
  • Online gas quality monitoring
  • PLC / SCADA
Anaerobic digestion

Mesophilic CSTR digestion

A continuously stirred tank reactor keeps feedstock, microorganisms and temperature uniform throughout the tank. Our flagship design uses a single 10,000 m³ CSTR in the mesophilic range with a hydraulic retention time of approximately 36 days.

Large industrial anaerobic digester tanks at a biogas facility
Cross-section of a CSTR anaerobic digester showing slurry inlet, central mixer, gas collection space, raw biogas outlet and digestate outletSlurry inletDigestate outletRaw biogas outletGas collection spaceCentral mixingMesophilictemperature controlUniform, continuouslymixed slurryCSTR · 1 × 10,000 m³ (flagship design)
Gas purification & upgrading

Gas cleaning, upgrading and compression

The purification configuration specified in the DPR. These technologies are supplied by specialist technology partners and are not proprietary to Deva Bio Engineering.

H₂S removal

Water washing / scrubbing with iron oxyhydroxide media

Hydrogen sulphide is removed early in the gas train to protect downstream equipment from corrosion and to meet CBG quality limits.

CO₂ removal & methane upgrading

Chilled-water scrubbing or two-stage membrane separation

Carbon dioxide is separated from the gas stream to raise methane content from 55–60% in raw biogas to at least 98% in the product gas.

Gas drying

Desiccant dryer with heatless regeneration

Moisture is removed so the gas meets dew-point requirements before high-pressure compression and storage.

High-pressure compression

Reciprocating compressor, design up to 250 bar

Upgraded gas is compressed in stages for cascade storage and dispatch as compressed biogas.

Automation & gas quality

PLC / SCADA with online gas quality monitoring

Process parameters and product gas composition are monitored continuously for stable, safe and documented operation.

Product gas

≥ 98% CH₄ · up to 250 bar · odourised

The result is compressed biogas suitable for cascade storage and dispatch, monitored continuously by online gas analysers.

Compression & filling

High-pressure compression and cascade filling

Dried, upgraded gas is compressed by reciprocating compressors to a design pressure of up to 250 bar, odourised, and stored in cylinder cascades from which CBG is dispatched.

High-pressure gas compressor package for CBG cascading
Compressed biogas flows from the compressor into a manifold feeding a cascade of high-pressure cylinders, from which CBG is dispatchedFrom compressorodourised, driedgas ≥ 98% CH₄PICascade storage · design up to 250 barDispatch
Digestate pathway

Digestion → separation → FOM / LFOM

Digestate leaving the CSTR is separated into solid and liquid fractions.

  • Digestate discharge — Digested material leaves the CSTR as digestate, containing undigested fibre, nutrients and process water.
  • Solid–liquid separation — Digestate is mechanically separated into a solid fraction and a liquid fraction.
  • Fermented Organic Manure — The solid fraction is recovered as Fermented Organic Manure (FOM) for soil application after conditioning.
  • Liquid Fermented Organic Manure — The liquid fraction (LFOM) is partly recirculated to slurry preparation and partly available as a liquid organic nutrient.

Actual FOM and LFOM quantities and their marketable quality depend on feedstock, plant operation and final product specifications, including applicable fertiliser regulations.

Digestate enters a solid–liquid separator; the solid fraction is discharged as FOM and the liquid fraction is collected as LFOM, partly recirculated to slurry preparationDigestateSolid–liquid separatorFOMsolid fractionLFOMliquid fractionPart recirculated to slurry preparation
DPR process configuration

The 14 integrated steps

As listed in the Detailed Project Report for the 5 TPD CBG plant.

  1. Napier grass harvesting and preparation
  2. Grass chopping and grinding
  3. Feedstock conveying
  4. Slurry preparation
  5. Anaerobic digestion through a mesophilic CSTR
  6. Raw biogas collection
  7. H₂S removal
  8. CO₂ removal and methane upgrading
  9. Gas drying
  10. High-pressure compression
  11. Odourisation
  12. CBG cascade filling
  13. Digestate solid–liquid separation
  14. FOM and LFOM recovery
Technical performance figures are based on the supplier's techno-commercial offer and remain subject to final engineering and contractual confirmation.